Preview

Litiyo i Metallurgiya (FOUNDRY PRODUCTION AND METALLURGY)

Advanced search

STEEL CORD WITH A COMPLETE PENETRATION OF COMPOUND INTO THE STRUCTURE

https://doi.org/10.21122/1683-6065-2011-2-85-89

Abstract

It is shown that one of the perspective types of metal cord for breaker layer of automobile tires are the constructions with maximal degree of rubber compound penetration at vulcanization. the constructions and technologies of metal cord productions with full rubber penetration (FrP) already in the process of treatment into rubber-cord cloth are developed at RUP “BMZ”.

About the Author

A. V. Vedeneev
Byelorussian Steel Works
Belarus


References

1. Arkens O. Economic steel cord constructions for the future // Becaert Corp. Report at the International ITEC 1996 conference, Akron, USA.

2. Xavier De Vos, Frans Van Giel. Open structure cord // Bekaert SA NV. Pat. No. US 5687557.

3. Xavier De Vos, Frans Van Giel. Steel cord and method of its production, steel cord cloth and devices for steel cord reinforcing element deformation// Bekaert SA NV. Pat. No. RU 2137869 С1.

4. Vedeneev A. V., Savenok A. N., Andrianov N. V., Ezhov V. V. Steel cord with improved compound penetration. Patent for usable model BY 1427 U dd. 01.03.2004.

5. Vedeneev A. V., Savenok A. N., Andrianov N. V., Ezhov. V. V. Steel cord with improved compound penetration. Patent RU 2256017 C1 dd. 10.07.2005.

6. Vedeneev A. V., Savenok A. N., Andrianov N. V., Ezhov V. V. Steel cord with improved compound penetration. Pat. BY 8166 C1 dd. 30.06.2006.


Review

For citations:


Vedeneev A.V. STEEL CORD WITH A COMPLETE PENETRATION OF COMPOUND INTO THE STRUCTURE. Litiyo i Metallurgiya (FOUNDRY PRODUCTION AND METALLURGY). 2011;(2):85-89. https://doi.org/10.21122/1683-6065-2011-2-85-89

Views: 2175


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 1683-6065 (Print)
ISSN 2414-0406 (Online)