FORMATION OF PLAN COST OF READY PRODUCTS OF STEEL PRODUCTION RUP «BMZ» BY MEANS OF MODULE CONTROLLING OF SYSTEM SAP R/3
https://doi.org/10.21122/1683-6065-2011-3-202-206
- Р Р‡.МессенРТвЂВВВВВВВВжер
- РћРТвЂВВВВВВВВнокласснРСвЂВВВВВВВВРєРСвЂВВВВВВВВ
- LiveJournal
- Telegram
- ВКонтакте
- РЎРєРѕРїРСвЂВВВВВВВВровать ссылку
Full Text:
Abstract
It is shown that formation of the planned cost price of finished goods of steel production of RUP«BMZ»by mean of the module of controlling system SAPR/3 – one of the most effective administrative tools at the current stage of market relations.
References
1. Antashov V. A., Uvarova G. V. Prakticheskii kontrolling. Mn., 2006.
2. Slavnikov D. V. Analiticheskie instrumenty upravleniya zatratami v sisteme kontrollinga. Mn., 2007.
3. Antashov V. A., Uvarova G. V. Ekonomicheskii sovetnik menedzhera. M., 2009.
4. Daile A. Praktika kontrollinga. M.: Finansy i statistika, 2003.
5. Ditger Kh. Planirovanie i kontrol': kontseptsiya kontrollinga. M.: Finansy i statistika, 1997.
Review
For citations:
Astratov S.N. FORMATION OF PLAN COST OF READY PRODUCTS OF STEEL PRODUCTION RUP «BMZ» BY MEANS OF MODULE CONTROLLING OF SYSTEM SAP R/3. Litiyo i Metallurgiya (FOUNDRY PRODUCTION AND METALLURGY). 2011;(3):202-206. (In Russ.) https://doi.org/10.21122/1683-6065-2011-3-202-206
ISSN 2414-0406 (Online)