FORMATION OF PLAN COST OF READY PRODUCTS OF STEEL PRODUCTION RUP «BMZ» BY MEANS OF MODULE CONTROLLING OF SYSTEM SAP R/3

https://doi.org/10.21122/1683-6065-2011-3-202-206

Full Text:

Abstract

It is shown that formation of the planned cost price of finished goods of steel production of RUP«BMZ»by mean of the module of controlling system SAPR/3 – one of the most effective administrative tools at the current stage of market relations.

For citations:


Astratov S.N. FORMATION OF PLAN COST OF READY PRODUCTS OF STEEL PRODUCTION RUP «BMZ» BY MEANS OF MODULE CONTROLLING OF SYSTEM SAP R/3. Litiyo i Metallurgiya (FOUNDRY PRODUCTION AND METALLURGY). 2011;(3):202-206. (In Russ.) https://doi.org/10.21122/1683-6065-2011-3-202-206