Preview

ASSESSMENT OF THERMAL LOSSES OF ENWALL DESION DURING OPERATION OF CHAMBER FURNACE

Abstract

The paper presents a methodology that allows to estimate the energy efficiency of the furnace modernization by replacing the enwall, as well as to determine the feasibility of using a multi-layer structure depending on the operating temperature of the furnace and the heat transfer conditions at the surface. The methodology, which allows to calculate the temperature of the surface of the lining on cooling during the upload-download details.

About the Authors

S. M. Kabishov
Belarusian National Technical University
Belarus

Kabishov Sergey, Belarusian National Technical University, 65, Nezavisimosti ave., Minsk, 200013, Belarus. E-mail:boxsmk@gmail.com. Теl.: +375 29 768 17 78.



P. E. Ratnikov
Belarusian National Technical University
Belarus


I. A. Trusova
Belarusian National Technical University
Belarus


D. V. Mendelev
Council of Ministers of the Republic of Belarus
Belarus
Departament of science and innovation development of the office


References

1. Arendarchuk, A. V., Baradachev A. S., Filippov V. I. Obshhepromyshlennye elektropechi periodicheskogo dejstvija [Common industrial electric batch]. Moscow, Energoatomizdat Publ.. 1990. 112 p.

2. Averin, S. I., Goldfarb E. M., Kravtsov A. F. [et al.] Raschety nagrevatel’nyh pechej[Calculations of heating furnaces]. Kharkiv, Engineering Publ., 1969. 540 p.


Review

For citations:


Kabishov S.M., Ratnikov P.E., Trusova I.A., Mendelev D.V. ASSESSMENT OF THERMAL LOSSES OF ENWALL DESION DURING OPERATION OF CHAMBER FURNACE. Litiyo i Metallurgiya (FOUNDRY PRODUCTION AND METALLURGY). 2015;(4):108-115. (In Russ.)

Views: 508


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 1683-6065 (Print)
ISSN 2414-0406 (Online)